Challenges

The data centre wanted to migrate from an existing Citrix NetScaler to the F5 Load Balancer. The customer had neither the manpower to implement this project nor knowledge of the steps needed. As Red Education is an Authorised Training Company for F5, the client asked if we could also handle this migration project. The brief to implement the migration included:
· Configure F5 Parallel setup for F5 (planned, part of Wave 3)
· Application Testing Troubleshooting · Production Cutover Status · Hypercare – required after cutover · Down time – Minimal to Zero

solutions

The Red Education team provided a step-by-step plan for the migration process, including:
· Review of Existing Implementation and Configuration · Testing of the Base Configuration of F5 Infrastructure Deployed · Services Configuration (LTM, APM and F5 DNS) · Testing of Services Deployed (LTM, APM and F5 DNS) · Pre-Production Integration and Testing (LTM, APM and F5 DNS) · Production Migration and Testing Hyper Care

Outcomes

The migration project from Netscaler to F5 was implemented successfully.

A fast blueprint for the migration – this was provided after 5 days (10-15 days is typical).

All prerequisites were met, including access to the End User’s systems and networks as necessary to perform the services, with support from technical support teams provided for all vendors and third parties.

“

Testimonials

“